MADRID, 25 Nov. (EUROPA PRESS) –

An incident detected in the railway infrastructure has caused average delays of 40 minutes this Saturday morning in the circulation of trains in the relations that connect Madrid with Andalusia and the capital with the Levant.

Adif reported the breakdown at 11:00 a.m. and the incident finally occurred shortly before 12:00 p.m., as reported by the public manager of the railway infrastructure on its social networks.

Specifically, the breakdown has taken place on the tracks between Los Gavilanes and the Torrejón de Velasco fork, which are standard gauge, so it has affected the high-speed Long and Medium Distance trains to Andalusia and the Levant.